Stormwater Committee seeks repairs for solar farm basin problems
Dighton Stormwater Committee seeks fixes for solar farm basin overtopping. Resident Frank Crisafulli raised concerns about basement seepage related to design challenges at the MA CS solar farm's retention basins. A Weston & Sampson report found discrepancies between as-built and design
Stormwater Committee · Meeting of January 21, 2026
Dighton Stormwater Committee seeks fixes for solar farm basin overtopping. Resident Frank Crisafulli raised concerns about basement seepage related to design challenges at the MA CS solar farm's retention basins. A Weston & Sampson report found discrepancies between as-built and design specifications, noting basin overtopping that could pose serious danger.
The committee agreed to request an amended proposal and site visits to address the concerns. The FY2027 budget includes a $15,000 placeholder for spring testing.
In the full story:
- The complete report — 254 words
Source: the Stormwater Committee meeting of January 21, 2026, compiled from the official minutes.
Members read the rest of this story and every Dighton meeting we cover, in full.
Become a memberAlready a member? Sign inA 30-day free trial needs a payment method. After it, your membership renews at the price shown at checkout until you cancel, which you can do anytime from your account. Subscription terms
Share this brief
Know someone in Dighton who follows town government? Share Townbrief Dighton: they can sign up free.